Upscaled screw piles have been proposed as a novel silent foundation solution for both offshore jacket structures and anchoring in various renewable energy applications. Replacing conventional pitch-matched installation approaches by over-flighted installation approaches has been proposed for single-helix screw piles to reduce installation vertical crowd force and torque whilst enhancing in-service tensile capacity and stiffness. This study, using DEM modelling, extends the scope of investigation to consider multi-helix screw piles and investigates installation and tensile in-service response, addressing the effect of helix spacing and installation advancement ratio together. The findings suggest that a pile featuring smaller helix spacing may necessitate less vertical force and torque for installation than a single-helix pile if over-flighted installation approaches are used, although the first (bottom) helix needs to be ‘deeply’ embedded to avoid the reduction of tensile capacity induced by additional helices. This differs from piles installed by pitch-matched approaches where additional helices typically increase installation force and torque. DEM micromechanical analyses help unveil the mechanisms behind the macroscopic response of such screw piles.

Wang, W., Brown, J., Ciantia, M., Previtali, M., Umar Sharif, Y., Davidson, C. (2025). The effect of installation advancement ratio on interaction between helices of screw piles for offshore renewable energy. OCEAN ENGINEERING, 316(15 January 2025) [10.1016/j.oceaneng.2024.120000].

The effect of installation advancement ratio on interaction between helices of screw piles for offshore renewable energy

Ciantia, MO;
2025

Abstract

Upscaled screw piles have been proposed as a novel silent foundation solution for both offshore jacket structures and anchoring in various renewable energy applications. Replacing conventional pitch-matched installation approaches by over-flighted installation approaches has been proposed for single-helix screw piles to reduce installation vertical crowd force and torque whilst enhancing in-service tensile capacity and stiffness. This study, using DEM modelling, extends the scope of investigation to consider multi-helix screw piles and investigates installation and tensile in-service response, addressing the effect of helix spacing and installation advancement ratio together. The findings suggest that a pile featuring smaller helix spacing may necessitate less vertical force and torque for installation than a single-helix pile if over-flighted installation approaches are used, although the first (bottom) helix needs to be ‘deeply’ embedded to avoid the reduction of tensile capacity induced by additional helices. This differs from piles installed by pitch-matched approaches where additional helices typically increase installation force and torque. DEM micromechanical analyses help unveil the mechanisms behind the macroscopic response of such screw piles.
Articolo in rivista - Articolo scientifico
Discrete element modelling (DEM); Helical anchor; Installation effect; Sand; Screw pile;
English
6-dic-2024
2025
316
15 January 2025
120000
open
Wang, W., Brown, J., Ciantia, M., Previtali, M., Umar Sharif, Y., Davidson, C. (2025). The effect of installation advancement ratio on interaction between helices of screw piles for offshore renewable energy. OCEAN ENGINEERING, 316(15 January 2025) [10.1016/j.oceaneng.2024.120000].
File in questo prodotto:
File Dimensione Formato  
Wang-2025-Ocean Engineer-VoR.pdf

accesso aperto

Tipologia di allegato: Publisher’s Version (Version of Record, VoR)
Licenza: Creative Commons
Dimensione 1.09 MB
Formato Adobe PDF
1.09 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10281/552109
Citazioni
  • Scopus 2
  • ???jsp.display-item.citation.isi??? 2
Social impact