Attenzione: i dati modificati non sono ancora stati salvati. Per confermare inserimenti o cancellazioni di voci è necessario confermare con il tasto SALVA LE MODIFICHE in fondo alla pagina
Bicocca Open Archive
The ICARUS T600 liquid argon (LAr) time projection chamber (TPC) underwent a major overhaul at CERN in 2016-2017 to prepare for the operation at FNAL in the Short Baseline Neutrino (SBN) program. This included a major upgrade of the photo-multiplier system and of the TPC wire read-out electronics. The full TPC wire read-out electronics together with the new wire biasing and interconnection scheme are described. The design of a new signal feed-through flange is also a fundamental piece of this overhaul whose major feature is the integration of all electronics components onto the signal flange. Initial functionality tests of the full TPC electronics chain installed in the T600 detector at FNAL are also described.
Bagby, L., Baibussinov, B., Behera, B., Bellini, V., Benocci, R., Betancourt, M., et al. (2021). Overhaul and installation of the ICARUS-T600 liquid argon TPC electronics for the FNAL Short Baseline Neutrino program. JOURNAL OF INSTRUMENTATION, 16(1) [10.1088/1748-0221/16/01/P01037].
Overhaul and installation of the ICARUS-T600 liquid argon TPC electronics for the FNAL Short Baseline Neutrino program
Bagby L.;Baibussinov B.;Behera B.;Bellini V.;Benocci R.;Betancourt M.;Bettini M.;Bonesini M.;Boone T.;Braggiotti A.;Brown J. D.;Budd H.;Calaon F.;Castellani L.;Centro S.;Cocco A. G.;Convery M.;Fabris F.;Falcone A.;Farnese C.;Fava A.;Fichera F.;Giarin M.;Gibin D.;Guglielmi A.;Guida R.;Hilgenberg C.;Howard B.;Ketchum W.;Marchini S.;Menegolli A.;Meng G.;Montanari C.;Mooney M.;Granados G. M.;Mueller J.;Nessi M.;Nicoletto M.;Pedrotta R.;Peghin R.;Petrillo G.;Pietropaolo F.;Rampazzo G.;Rappoldi A.;Raselli G. L.;Rossella M.;Rubbia C.;Scaramelli A.;Sergiampietri F.;Spanu M.;Torretta D.;Torti M.;Tortorici F.;Tsai Y. T.;Turcato M.;Varanini F.;Ventura S.;Vercellati F.;Vignoli C.;Warner D.;Wilson R. J.;Worcester M.;Zani A.;Zatti P. G.
2021
Abstract
The ICARUS T600 liquid argon (LAr) time projection chamber (TPC) underwent a major overhaul at CERN in 2016-2017 to prepare for the operation at FNAL in the Short Baseline Neutrino (SBN) program. This included a major upgrade of the photo-multiplier system and of the TPC wire read-out electronics. The full TPC wire read-out electronics together with the new wire biasing and interconnection scheme are described. The design of a new signal feed-through flange is also a fundamental piece of this overhaul whose major feature is the integration of all electronics components onto the signal flange. Initial functionality tests of the full TPC electronics chain installed in the T600 detector at FNAL are also described.
Bagby, L., Baibussinov, B., Behera, B., Bellini, V., Benocci, R., Betancourt, M., et al. (2021). Overhaul and installation of the ICARUS-T600 liquid argon TPC electronics for the FNAL Short Baseline Neutrino program. JOURNAL OF INSTRUMENTATION, 16(1) [10.1088/1748-0221/16/01/P01037].
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10281/357721
Citazioni
5
2
Social impact
Conferma cancellazione
Sei sicuro che questo prodotto debba essere cancellato?
simulazione ASN
Il report seguente simula gli indicatori relativi alla propria produzione scientifica in relazione alle soglie ASN 2021-2023 del proprio SC/SSD. Si ricorda che il superamento dei valori soglia (almeno 2 su 3) è requisito necessario ma non sufficiente al conseguimento dell'abilitazione. La simulazione si basa sui dati IRIS e sugli indicatori bibliometrici alla data indicata e non tiene conto di eventuali periodi di congedo obbligatorio, che in sede di domanda ASN danno diritto a incrementi percentuali dei valori. La simulazione può differire dall'esito di un’eventuale domanda ASN sia per errori di catalogazione e/o dati mancanti in IRIS, sia per la variabilità dei dati bibliometrici nel tempo. Si consideri che Anvur calcola i valori degli indicatori all'ultima data utile per la presentazione delle domande.
La presente simulazione è stata realizzata sulla base delle specifiche raccolte sul tavolo ER del Focus Group IRIS coordinato dall’Università di Modena e Reggio Emilia e delle regole riportate nel DM 598/2018 e allegata Tabella A. Cineca, l’Università di Modena e Reggio Emilia e il Focus Group IRIS non si assumono alcuna responsabilità in merito all’uso che il diretto interessato o terzi faranno della simulazione. Si specifica inoltre che la simulazione contiene calcoli effettuati con dati e algoritmi di pubblico dominio e deve quindi essere considerata come un mero ausilio al calcolo svolgibile manualmente o con strumenti equivalenti.