The ICARUS T600 liquid argon (LAr) time projection chamber (TPC) underwent a major overhaul at CERN in 2016-2017 to prepare for the operation at FNAL in the Short Baseline Neutrino (SBN) program. This included a major upgrade of the photo-multiplier system and of the TPC wire read-out electronics. The full TPC wire read-out electronics together with the new wire biasing and interconnection scheme are described. The design of a new signal feed-through flange is also a fundamental piece of this overhaul whose major feature is the integration of all electronics components onto the signal flange. Initial functionality tests of the full TPC electronics chain installed in the T600 detector at FNAL are also described.

Bagby, L., Baibussinov, B., Behera, B., Bellini, V., Benocci, R., Betancourt, M., et al. (2021). Overhaul and installation of the ICARUS-T600 liquid argon TPC electronics for the FNAL Short Baseline Neutrino program. JOURNAL OF INSTRUMENTATION, 16(1) [10.1088/1748-0221/16/01/P01037].

Overhaul and installation of the ICARUS-T600 liquid argon TPC electronics for the FNAL Short Baseline Neutrino program

Benocci R.;Bonesini M.;Falcone A.;Spanu M.;Torti M.;
2021

Abstract

The ICARUS T600 liquid argon (LAr) time projection chamber (TPC) underwent a major overhaul at CERN in 2016-2017 to prepare for the operation at FNAL in the Short Baseline Neutrino (SBN) program. This included a major upgrade of the photo-multiplier system and of the TPC wire read-out electronics. The full TPC wire read-out electronics together with the new wire biasing and interconnection scheme are described. The design of a new signal feed-through flange is also a fundamental piece of this overhaul whose major feature is the integration of all electronics components onto the signal flange. Initial functionality tests of the full TPC electronics chain installed in the T600 detector at FNAL are also described.
Articolo in rivista - Articolo scientifico
Data acquisition circuits; Front-end electronics for detector readout; Neutrino detectors; Time projection chambers;
English
2021
16
1
P01037
open
Bagby, L., Baibussinov, B., Behera, B., Bellini, V., Benocci, R., Betancourt, M., et al. (2021). Overhaul and installation of the ICARUS-T600 liquid argon TPC electronics for the FNAL Short Baseline Neutrino program. JOURNAL OF INSTRUMENTATION, 16(1) [10.1088/1748-0221/16/01/P01037].
File in questo prodotto:
File Dimensione Formato  
10281-357721_VoR.pdf

accesso aperto

Tipologia di allegato: Publisher’s Version (Version of Record, VoR)
Licenza: Creative Commons
Dimensione 7.69 MB
Formato Adobe PDF
7.69 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10281/357721
Citazioni
  • Scopus 7
  • ???jsp.display-item.citation.isi??? 4
Social impact